Montreal · May 2026
Cream MDF kitchen in Swiss Coffee
- MDF
- Cream → Swiss Coffee
I refinished this cream MDF kitchen in Montreal on-site at the end of May 2026, in Swiss Coffee with sprayed Renner coatings. The Day 1 to Day 5 videos I posted in June were filmed here.
The kitchen was already light. I primed it and sprayed Renner top coats over every door and box for an even factory-style finish.
- Area
- Montreal
- When
- May 2026
- Before
- Cream MDF doors
- After
- Swiss Coffee
- Cabinets
- MDF doors
- Colour
- Swiss Coffee (shown on screen in my video)
- Finish
- Sprayed Renner coatings, on-site


Day by day
Every step as I posted it on Instagram. Dates are post dates; day numbers are the ones written on the videos.
- New project. Walk-through before: cream MDF doors, burgundy walls.Open on Instagram
- Dust barrier up.Open on Instagram
- Day 3: “Everything is ready for priming.”Open on Instagram
- Day 3: priming.Open on Instagram
- Day 4: sanding the primer with Festool, getting ready for the Renner top coats.Open on Instagram
- Day 5: getting ready to reinstall.Open on Instagram
- Day 5: “A new kitchen. Without replacing the cabinets.”Open on Instagram
- “All done.” The colour is Swiss Coffee.Open on Instagram
- Photo set from the job: sanding, spraying, the finished kitchen.Open on Instagram
- The Day 1 to Day 5 series I posted in June (8 to 12) was filmed in this kitchen.Open on Instagram
From the job
Filmed and photographed on site, on this kitchen.

Kitchen masked, spray area closed off

Sanding a door with dust extraction
Day 3: priming on-site

Spraying the uppers
Day 5: sample door and Renner can
The colour, on screen: Swiss Coffee
Fast first step
Want this for your kitchen?
Send a few photos, your area and the basic cabinet details. I review them myself and come back with a quote and next steps.







